Technical documentation for Little Cottonwood Canyon Gondola Phase 1 (2026). Analysis of UDOT EIS data, SB 110 funding, and mid-canyon engineering specifications.
-
Updated
May 9, 2026
Technical documentation for Little Cottonwood Canyon Gondola Phase 1 (2026). Analysis of UDOT EIS data, SB 110 funding, and mid-canyon engineering specifications.
Add a description, image, and links to the lcc-gondola topic page so that developers can more easily learn about it.
To associate your repository with the lcc-gondola topic, visit your repo's landing page and select "manage topics."