You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
andreid317 edited this page Jan 8, 2020
·
3 revisions
Shutdown Circuit Project Description
Responsible Engineers
Andrei Divinagracia
High Level Project Objective
To design the vehicle's main safety circuit, capable of opening the AIRs subject to a system fault.
Purpose of the Project
The AIRs of the vehicle control the tractive system operation, whether the vehicle HV is powered or not. The AIR coils have many inline switches that all get opened when a dangerous event occurred, therefore shutting off the vehicle.
This is a very good resource to get an idea of what this circuit does https://sf1e.slack.com/files/U7G3T4W9M/FBQHCC1R8/2012-rev-sae-instrumentation-michalek.pdf
Deliverables
Create a summary of the rules for the shutdown circuit for 2017/18 rules and 2019 rules
Create a presentation for the team demonstrating your understanding of the system functionality
High level system block diagram showing the SDC interfacing with the rest of the car
Present a plan for designing a rules-compliant shutdown circuit, feel free to reference other teams' designs
BOM for all parts in SDC
Schematic for SDC
PCB if required for SDC (2 layers, within 100mmx100mm)