Skip to content

Update ampvis2

Update ampvis2 #20965

Triggered via pull request February 13, 2026 09:31
Status Cancelled
Total duration 38s
Artifacts

pr.yaml

on: pull_request
Matrix: Setup cache and determine changed repositories
Matrix: Lint tool-list
Matrix: Lint Python scripts
Matrix: Lint R scripts
Matrix: Test tools
Check file sizes
Check file sizes
Matrix: Combine chunked test results
Matrix: Deploy
Check workflow success
2s
Check workflow success
Report deploy status
0s
Report deploy status
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Setup cache and determine changed repositories (3.11)
Canceling since a higher priority waiting request for pr-refs/pull/7418/merge exists
Setup cache and determine changed repositories (3.11)
The operation was canceled.
Check workflow success
Process completed with exit code 1.
Galaxy Tool Linting and Tests for push and PR
Canceling since a higher priority waiting request for pr-refs/pull/7418/merge exists