Skip to content

14th scan done, doc 54: 5 new gaps#974

Open
otherness-app[bot] wants to merge 2 commits into
mainfrom
opencode/schedule-0071dc-20260423073340
Open

14th scan done, doc 54: 5 new gaps#974
otherness-app[bot] wants to merge 2 commits into
mainfrom
opencode/schedule-0071dc-20260423073340

Conversation

@otherness-app

@otherness-app otherness-app Bot commented Apr 23, 2026

Copy link
Copy Markdown
Contributor

14th autonomous vision scan complete. Step A exiting for Step B.


What ran:

  • SCAN 1 (promote shipped): No Future items promotable — no merged PR titles matched recent Future item text
  • SCAN 2 (flag stale): All Present items' referenced files found — no stale flags
  • SCAN 3 (infer from code): Backlog at 245 items (below 400 ceiling); no TODO/FIXME markers found in code
  • SCAN 4 (deprecate 90+ day): No items old enough to deprecate (all docs are <90 days old)
  • SCAN 5 (pressure scoring): 5/5 bullets scored "addressed" via domain-noun matching — but this is the over-broad scoring problem (50.3); all five pressure lenses remain genuinely open

New doc 54 created — 5 novel gaps not present in any of the prior 245 Future items:

# Lens Gap
54.1 Reliability coord.md at 1,806 lines is an attention-fragmentation risk — needs 1,500-line cap gate (analogous to sm.md's 45.1)
54.2 Honesty Step A wall-clock consumes runner time that reduces what's available to ENG in Step B — budget allocation is invisible and uncorrelated with zero-PR sessions
54.3 Self-improvement SCAN 0 fixed-400 ceiling is currently inactive (corpus=245, below threshold) — needs dynamic rate-based ceiling: items_shipped_last_10 / total_items < 0.02
54.4 Onboarding otherness-config.yaml has no migration path when new fields are added to the template — projects onboarded weeks ago silently miss new config features
54.5 Visibility Managed project developers (non-operators) have zero visibility into what otherness shipped to their repo — no weekly digest, no plain-English summary

Triggered by scheduled workflow

New%20session%20-%202026-04-23T07%3A33%3A39.849Z
opencode session  |  github run

otherness[bot] added 2 commits April 23, 2026 07:51
…sure gaps)

Vibe-vision autonomous scan (Step A). No human input required.
Changes: 1 file changed, 74 insertions(+)

Scans performed:
- Scan 1: no Future items promotable via PR title match (no matching titles)
- Scan 2: no stale Present items (all referenced files found)
- Scan 3: no untracked TODOs/FIXMEs; backlog at 245 (below 400 ceiling)
- Scan 4: no items 90+ days without issues
- Scan 5: 5/5 bullets scored via domain-noun matching (over-broad per 50.3) — all five lenses remain genuinely open

New doc 54 adds 5 novel gaps absent from prior 245-item corpus:
- 54.1: coord.md at 1,806 lines is an attention-fragmentation risk (Lens 1)
- 54.2: Step A wall-clock consumes time that should go to ENG/Step B (Lens 2)
- 54.3: SCAN 0 ceiling at 400 is currently inactive (corpus=245) — needs dynamic rate-based ceiling (Lens 3)
- 54.4: otherness-config.yaml has no migration path when schema evolves (Lens 4)
- 54.5: managed project developers have no visibility into what otherness shipped for them (Lens 5)

Signed-off-by: otherness[bot] <otherness[bot]@users.noreply.github.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

0 participants