Skip to content

Commit

Permalink
[IMP] mrp: workcenter wording adjustment
Browse files Browse the repository at this point in the history
closes #11627

X-original-commit: 1a72b05
Signed-off-by: Zachary Straub (zst) <[email protected]>
  • Loading branch information
StraubCreative committed Dec 21, 2024
1 parent bdbff4f commit 77acc85
Showing 1 changed file with 1 addition and 1 deletion.
Original file line number Diff line number Diff line change
Expand Up @@ -42,7 +42,7 @@ assigned to a work center:
- :guilabel:`Time Efficiency`: used to calculate the expected duration of a work order at the work
center; for example, if a work order normally takes one hour and the efficiency is set to 200%,
the work order will take 30 minutes
- :guilabel:`Capacity`: the number of operations that can be performed at the work center
- :guilabel:`Capacity`: the number of products that can be processed at the work center
simultaneously
- :guilabel:`OEE Target`: the target for efficiency at the work center
- :guilabel:`Time before prod.`: setup time required before work can commence
Expand Down

0 comments on commit 77acc85

Please sign in to comment.