Skip to content

Add minor cosmetic improvements structured-task-scope related code #191

Add minor cosmetic improvements structured-task-scope related code

Add minor cosmetic improvements structured-task-scope related code #191

Triggered via push October 18, 2023 20:10
Status Failure
Total duration 2m 35s
Artifacts

test.yml

on: push
Matrix: test-clj
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test-clj (11)
Process completed with exit code 1.
test-clj (17)
The job was canceled because "_11" failed.
test-clj (17)
Process completed with exit code 1.
test-clj (19)
The job was canceled because "_11" failed.
test-clj (19)
The operation was canceled.
test-clj (18)
The job was canceled because "_11" failed.
test-clj (18)
The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.