Closed as duplicate
Description
Detected by CI Gremlin after a failed GitHub Actions attempt succeeded on rerun.
Tests:
Test Suite
Error:
Process completed with exit code 1.
Cleaning up orphan processes
Failed job runs:
- https://github.com/clockworklabs/SpacetimeDB/actions/runs/40241368256/job/121318642522 (Test Suite, attempt 1 -> 2)
Timeout detection:
- none
Context:
- none
Metadata
Metadata
Assignees
Labels
No labels
Activity
clockwork-labs-bot commentedon Oct 26, 2026
Exact-attempt diagnosis
Inspected only run 40241368256, job 121318642522, Test Suite, attempt 1, for PR #6378, head
8eed3ca89e4e69920b680e831c8ee3107f0d9fdc. The job API confirms attempt 1;1 -> 2is the detector transition. No rerun logs were used for diagnosis.This job is an aggregate gate, not a test execution job. At 23:03:30 UTC on October 25,
Check component resultsran withRUST_RESULT=cancelled. Rust build, serial Rust, C#, C++, native SDK, and browser SDK inputs were allsuccess.Bash
-epassestest "${RUST_BUILD_RESULT}" = success, then exits 1 attest "${RUST_RESULT}" = success. Root cause visible in this exact job: propagation of a cancelled parallel-Rust component, not an independent product-test failure.Cleaning up orphan processesis routine cleanup, not the error. Unity is not one of the seven inputs checked by this gate, so the separate Unity failure is not its direct cause.The gate's own log does not explain why Rust was cancelled. That incident is separately diagnosed from its exact linked job/attempt in #6380: a large Rust archive consumed the shared ten-minute budget; nextest reported all 412 selected tests passed immediately before job cancellation.
Suggested updated title:
CI flake: Test Suite aggregate fails because RUST_RESULT is cancelledDuplicate analysis
Searched open and closed public issues using
Test Suite cancelled,RUST_RESULT cancelled,rust-tests-linux, and broad archive/artifact timeout terms; inspected matching Test flakes diagnoses and the consolidated tracker.Leaving open: #6330 is not an authorized automatic duplicate-closure target.