Milestones
List view
Deepen billing operations, check their settled interfaces and move the billing package without changing behavior; give the SDAT CLI and scheduler a shared structured import outcome. Complete when: each issue meets its own acceptance criteria; #855 has completed evidence children, published and linked later children, documented billing transaction ownership with community-then-period lock order, and linked deferred work; #856 has the same pinned strict mypy command and explicit scope locally and in CI, linked later typing children, no blanket typing escapes and a recorded unchecked scope; #857 has a complete move map, nested-package mutation discovery and one atomic move with no compatibility shims, with startup, billing tests, strict typing and mutation collection using the new paths; #754 has shared structured outcomes, preserved import/retry/dry-run/live-pool behavior, adapter and concurrency regressions, the existing importer/scheduler suites, scripts/tdd_cycle.sh gate and substantive CodeRabbit app review. Changes are behavior-preserving and do not establish new billing policy or real-delivery compatibility. Synthetic tests do not stand in for owner or production approval.
No due date•1/4 issues closedComplete the gated public-site redesign and Verein journeys under gustych/openleg-ops#78, with truthful content, private association workflows and verified payment/reporting foundations. #825-#830 remain on hold until the user explicitly resumes them; all other recorded implementation holds also remain in force. Milestone assignment does not resume implementation or authorize a partial launch. Complete when: each assigned issue meets its own acceptance criteria; bounded deletion-failure logging excludes sensitive data; the shared static design, homepage, destinations, directory, role explanations and source-backed guides pass their HTTP, responsive, keyboard, no-JavaScript and privacy checks; German-first DE/FR/EN/IT journeys have recorded factual, legal and native-language review; crawl rules, canonicals, language metadata and sitemaps reflect actual approved publication states; membership admission, fees, renewal, resignation, scoped board identities and notices have transaction/concurrency evidence; real meetup details and notes have explicit approval; all-funds reports have source reconciliation and independent review; bank/Swiss QR instructions have independent decoding, print checks and separately verified recipient evidence. Full activation requires the complete language, legal, privacy, payment and technical launch gates, including mandatory TWINT and actual settlement evidence. Real bank, board and association facts, formation, adopted statutes and owner approvals remain human milestones. Synthetic tests do not stand in for owner or production approval. Release v0.2.0 (tracker #949) put the new site design, the openleg-ctl wheel (#950) and the first workspace changes (#943, #944) on openleg.ch on 2026-11-23, before the language, privacy and claims reviews (#750, #559, #558, #604) were done. The rest of the LEG administration workspace (#942, with #945-#948) follows in v0.2.1.
No due date•8/40 issues closedVisitors choose fictional demo accounts and independently complete the Sonnwil product journeys in isolated disposable village copies. Complete when all scoped journeys, permissions, local side-effect sinks, reset/expiry and concurrent visitor isolation are verified, and the private operations delivery records a reachable hosted release. Synthetic evidence does not establish real VNB, hardware or accounting acceptance. No due date or owner commitment is implied.
No due date•18/20 issues closedComplete when the release can be validated read-only and recovered forward, previous-image startup limitations are explicit, and owners approve governance, privacy, effective client limiting and cache incident handling.
No due date•5/9 issues closedComplete when a consenting pilot supplies real device/access evidence and the collector, freshness, notice and forecast flows are validated against it. Device telemetry and forecasts remain separate from regulated billing evidence.
No due date•2/6 issues closedComplete when engineering upload fixes and current-brand GitHub assets pass review, and named native-language, printing and assistive-technology checks are recorded. Automated browser checks do not replace those human results.
No due date•6/9 issues closedComplete when the bounded engineering rules and accepted-source intake pass review, and the remaining real-delivery, unequal-total and battery decisions have the relevant evidence or an explicitly narrowed successor scope.
No due date•4/7 issues closedComplete when the operating model and service facts have their named owner approvals, and the supported migration contract is documented and verified. Complete portability, all-VNB support and service guarantees are outside any claim unsupported by those facts.
No due date•4/6 issues closed