Skip to content

Repository files navigation

Project Aurora / 辰光项目

Classroom simulation only — fictional parties, data, contacts and evidence.
仅供课堂展示与讨论——当事人、数据、联系人及证据均为虚构或模拟。

Project Aurora is a bilingual teaching case concerning the establishment of a 50/50, full-function electric-vehicle joint venture in Hungary by a fictional Chinese battery group and a fictional Hungarian vehicle manufacturer. The repository combines a complete transaction-document suite with a simulated EU merger notification under the EU Merger Regulation.

辰光项目是一套中英双语跨境合资交易教学案例,场景为一家虚构的中国动力电池集团与一家虚构的匈牙利整车企业在匈牙利设立50/50、具有完整功能的新能源汽车合资企业。本仓库同时包含完整交易文件体系和欧盟经营者集中申报模拟材料。

Repository map / 仓库导航

Folder Contents Recommended starting point
01_case_and_teaching Case bible and instructor guide / 案例总册及教学指南 00 Master Casebook
02_core_transaction Investment agreement, shareholders' agreement and articles / 核心交易协议 01 Investment Agreement
03_ancillary_and_closing Operational, financing, compliance and closing documents / 附属及交割文件 04 Operational Pack I
04_merger_control Regulatory memo, Form CO, annex pack and filing workbook / 欧盟经营者集中材料 09 Mock Form CO
05_quality_assurance Render, formula and consistency checks / 核验记录 QA Report

Every Word document has a matching PDF copy for browser reading. Editable DOCX and XLSX files are retained for classroom exercises.

每份 Word 文档均附有便于浏览器直接阅读的 PDF 版本,同时保留 DOCX 和 XLSX 可编辑文件供课堂练习使用。

Baseline case / 基准事实

  • Parties: Huayao Power Battery Co., Ltd. and Danube Automotive Nyrt. / 华曜动力电池股份有限公司与多瑙汽车制造股份有限公司。
  • Joint venture: Sino-Danube New Energy Vehicles Kft. / 中匈新能源汽车有限公司。
  • Structure: 50/50 joint control; full-function joint venture in Debrecen, Hungary.
  • Product: AURORA-branded battery-electric passenger vehicles; 120,000 vehicles annual capacity.
  • Funding: EUR 1.40 billion total project cost, comprising EUR 500 million equity, EUR 650 million debt and EUR 250 million simulated Hungarian support.
  • Merger control: full Form CO, normal procedure, Phase I unconditional-clearance thesis.

See docs/DATA_AND_ASSUMPTIONS.md for the complete fact and data protocol.

How to comment / 如何评论

Use the repository's Issues tab and select the appropriate template:

  1. Transaction drafting comment — clauses, governance, financing, IP and risk allocation.
  2. EU merger-control comment — jurisdiction, market definition, competitive assessment and Form CO completeness.
  3. Teaching feedback — classroom flow, exercises, accessibility and suggested improvements.

Please cite the document number, clause/section and page. Detailed instructions are in docs/REVIEW_AND_COMMENT_GUIDE.md.

Important limitations / 重要限制

This repository does not contain legal advice, an executable transaction package or an actual notification. It must not be signed, relied upon or submitted to any authority. A real transaction would require verified corporate and financial evidence, current Hungarian, Chinese and EU-law advice, Commission pre-notification engagement, confidentiality review and qualified electronic signatures.

本仓库不构成法律意见、可签署交易文本或真实申报材料,不得据此签署、执行或向监管机关递交。真实交易仍需核实主体、财务和市场证据,取得中国、匈牙利及欧盟现行法律意见,开展欧盟委员会申报前沟通、保密审查并使用合格电子签名。

Rights notice / 权利说明

No open-source or Creative Commons licence is granted by inclusion in this repository. Viewing and commenting are permitted through the repository's access settings; copying, redistribution or commercial use requires the repository owner's permission.

本仓库未授予开源或知识共享许可。访问者可依据仓库权限阅读并评论;复制、再发布或商业使用须另行取得仓库所有者许可。

About

Bilingual classroom simulation: China-Hungary EV joint venture transaction documents and EU Form CO filing package

Topics

Resources

Contributing

Stars

0 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors