Skip to content

upping Java to 25, #163

upping Java to 25,

upping Java to 25, #163

Triggered via push October 17, 2025 11:29
Status Failure
Total duration 41s
Artifacts

packaging.yml

on: push
Matrix: package
Fit to window
Zoom out
Zoom in

Annotations

7 errors
package (macos-latest)
Process completed with exit code 1.
package (ubuntu-latest)
The strategy configuration was canceled because "package.macos-latest" failed
package (ubuntu-latest)
The operation was canceled.
package (macos-15-intel)
The strategy configuration was canceled because "package.macos-latest" failed
package (macos-15-intel)
The operation was canceled.
package (windows-latest)
The strategy configuration was canceled because "package.macos-latest" failed
package (windows-latest)
The operation was canceled.