Skip to content

some changes

some changes #1

Triggered via push September 11, 2025 13:21
Status Failure
Total duration 38s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
test (x86_64-windows-gnu)
Process completed with exit code 1.
test (aarch64-windows-gnu)
Process completed with exit code 1.
test (aarch64-windows-gnu)
The strategy configuration was canceled because "test.x86_64-windows-gnu" failed
test (aarch64-linux-gnu)
The operation was canceled.
test (aarch64-linux-gnu)
The strategy configuration was canceled because "test.x86_64-windows-gnu" failed
test (x86_64-linux-gnu)
The operation was canceled.
test (x86_64-linux-gnu)
The strategy configuration was canceled because "test.x86_64-windows-gnu" failed
test (aarch64-linux-musl)
The operation was canceled.
test (aarch64-linux-musl)
The strategy configuration was canceled because "test.x86_64-windows-gnu" failed
test (x86_64-linux-musl)
The operation was canceled.
test (x86_64-linux-musl)
The strategy configuration was canceled because "test.x86_64-windows-gnu" failed
test (x86_64-macos-none)
The operation was canceled.
test (x86_64-macos-none)
The strategy configuration was canceled because "test.x86_64-windows-gnu" failed
test (aarch64-macos-none)
The operation was canceled.
test (aarch64-macos-none)
The strategy configuration was canceled because "test.x86_64-windows-gnu" failed