Skip to content

Commit 80aaf71

Browse files
authored
blog: Rolling Out Action Authority on New Surfaces (#653)
* blog: add Rolling Out Action Authority on New Surfaces Operational playbook post that extends the existing shadow-to- enforcement-cutover-decision-tree per-surface for the action-authority extensions. Practical counterweight to the five theory posts shipped this session. Structure: - Week 1: Surface inventory (template, sanity check) - Week 2: Shadow-mode instrumentation per surface (memory / merge / click / voice instrumentation table) - Week 3: Per-surface gate primitives + calibration (per-surface primitive tables matching the sibling posts' caps and patterns) - Week 4: Cutover, lowest cost-of-false-positive-denial first (memory → click → voice → merge) - Rollback decision tree (per-surface thresholds with explicit heuristic labeling) - Monitoring (first 72h / first month / ongoing) - Runbook template (7 entries per surface) - What it is not / What it is The per-surface gate primitives are 15-of-16 verbatim or near-verbatim matches with the sibling posts' actual caps (per consistency reviewer): - Memory: per-tenant write quota, TTL on unverified facts, per-write provenance, scope isolation - Merge: distinct-approver, requires_human_approval, per-session promotion budget, deploy-gate cap - Click: requires_fresh_screenshot, cross-tenant navigation deny, target-intent risk schedule, session budget denominated in risk - Voice: predictive reservation, wall-clock cap, tier-aware gating, per-turn-boundary re-check Reviews: internal cycles 1-3 (scorecard 9.4/10), glossary linker applied 7 contextual links. Cycle 1 caught and fixed: - Terminology drift "reserve-to-actual ratio" -> "reserve-to-commit ratio" (canonical corpus term) - Tag "rollout" -> "adoption" to match cutover-decision-tree precedent - Click "wall-clock cap" reworded to match sibling's actual framing ("session budget denominated in risk, not count") - Cutover-order metric clarified as "cost of false-positive denial," not action blast radius - Rollback R/A row scoped to voice-specific - 20%/40%/30% concentration thresholds labeled as starting heuristics - Week 3 calibration window made explicit ("at least a week... calibrating four surfaces in parallel typically requires extending Week 3 to 2-3 weeks") - Two rhetorical closers cut; "What Action Authority Adoption Is" section tightened from anaphoric essay to operational summary This post depends on the five sibling PRs being merged first (#648-#652) so its many cross-links resolve. * blog: apply codex round-1 review to rolling-out-action-authority-on-new-surfaces Apply/skip tally: 8 applied, 0 pushed back. Applied: - L36 synthesis quote: replaced "the lifecycle is the stable layer" (which is not the exact synthesis H2 wording) with prose paraphrase that aligns with the actual H2 "Reserve-Commit Is the Stable Layer." - L45 / L140 / L225 "risk order" / "lowest-risk" framing aligned with L142 clarification: now "false-positive-cost order" / "lowest-false-positive-cost" throughout, matching how the cutover order is actually ranked. - L103 absolute "the quota is wrong / not constraining anything" softened to "Substantially higher rates suggest...; substantially lower rates suggest...". Calibration target labeled as starting heuristic. - L125 "Most shadow weeks produce a clean bimodal distribution" hedged: "When the shadow data produces a clearly bimodal distribution, the cap belongs in the gap; when it does not, the schedule needs more (target, intent) features." - L138 generalized "reserve-to-commit ratio across all four surfaces" claim scoped: voice has a true reserve-to-commit ratio; the other three use cap-fire rate vs shadow baseline as the analogue. - L152 ">85% intended denials" labeled as a minimum triage bar with explicit note that sensitive surfaces (merge, voice mid-conversation) target higher fractions. - L187 "Reserve-to-actual ratio per surface" rewritten to "Voice reserve-to-commit ratio, trending; for the other three surfaces, cap-fire rates vs the shadow-mode baseline." Fixes both the terminology drift (capital-R variant the replace_all missed) and the cross-surface ratio generalization. Codex verified all per-surface gate primitives match the sibling PRs #648-#652 and confirmed the SEO, code-accuracy, and tone dimensions clean. * blog: reschedule rolling-out-action-authority-on-new-surfaces to 2026-06-20 Moved from 2026-05-22 to 2026-06-20 to land one week after the synthesis post in the weekly publishing cadence. Final arc dates: - memory 5/16 - merge 5/23 - computer-use 5/30 - voice 6/06 - synthesis 6/13 - rollout playbook 6/20 Also adjusted "The last five posts" to "The recent five-post arc" since the series no longer publishes daily.
1 parent bfe5390 commit 80aaf71

1 file changed

Lines changed: 240 additions & 0 deletions

File tree

0 commit comments

Comments
 (0)