Skip to content

chore: release v13.3.0-prerelease.9 #45

chore: release v13.3.0-prerelease.9

chore: release v13.3.0-prerelease.9 #45

Triggered via pull request May 20, 2026 13:37
Status Cancelled
Total duration 1m 24s
Artifacts

ci.yml

on: pull_request
Matrix: integration-test
Format Check
18s
Format Check
Build and Test
1m 5s
Build and Test
CI Gate
4s
CI Gate
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Integration Test (podman)
Canceling since a higher priority waiting request for ci-refs/pull/22/merge exists
Integration Test (podman)
The operation was canceled.
Build and Test
Canceling since a higher priority waiting request for ci-refs/pull/22/merge exists
Build and Test
The operation was canceled.
Integration Test (docker)
Canceling since a higher priority waiting request for ci-refs/pull/22/merge exists
Integration Test (docker)
The operation was canceled.
CI Gate
Process completed with exit code 1.
CI Gate
Integration Test finished with result 'cancelled'.
CI Gate
Build and Test finished with result 'cancelled'.
CI
Canceling since a higher priority waiting request for ci-refs/pull/22/merge exists