These documents own detailed scope and decision gates. PLAN owns the open-work overview and DEFERRED the deferred items. A deferred design requires its recorded trigger and authorization before implementation. Dates record when the listed status took effect; see the maintenance rules.
| Document | Status | Date | Summary |
|---|---|---|---|
| Agent Explorability Benchmark | completed | 2026-10-20 | Benchmark contract, harness and frozen tasks, built and used through the help studies; later interface changes reuse them in agent regression checks. |
- Archived plans: preserved implementation evidence and historical snapshots.
- Rejected plans: designs decided against, with their reasoning.