Record visual complete in the timeline.
When to do the calculation should be configurable. It needs to be done once each 'page', by default we can consider it by working back from the script end / next page start.
Percentage required for visual complete, can be saved with the script too (per page).
A list of the percentage complete at each new frame should be recorded. A new tab in the result details could show this.
Code is already checked in for recording videos and calculating % differences between images. This code is already faster than most other tools that calc visual complete, but could be improved further.
Record visual complete in the timeline.
When to do the calculation should be configurable. It needs to be done once each 'page', by default we can consider it by working back from the script end / next page start.
Percentage required for visual complete, can be saved with the script too (per page).
A list of the percentage complete at each new frame should be recorded. A new tab in the result details could show this.
Code is already checked in for recording videos and calculating % differences between images. This code is already faster than most other tools that calc visual complete, but could be improved further.