10 epics, executed sequentially. Each epic is a durable reference file that Beads point back to.
Status (2026-05-07): All 10 epics complete. Project is at v0.14.0 with 6 CLI commands wired (check, validate, eval, report, optimize, drift).
| # | Epic | Status | Closed | File |
|---|---|---|---|---|
| 01 | Repo Foundation and Operating Standard | Done | 2026-03-29 | epic-01 |
| 02 | Spec Layer and Contract System | Done | 2026-03-29 | epic-02 |
| 03 | Package Integrity and Deterministic Checks | Done | 2026-03-29 | epic-03 |
| 04 | Evidence Layer, Persistence, and Run Lifecycle | Done | 2026-03-29 | epic-04 |
| 05 | Trigger Harness and Skill Roster Simulation | Done | 2026-03-29 | epic-05 |
| 06 | Functional Execution Harness and Observation Layer | Done | 2026-03-29 | epic-06 |
| 07 | Judgment Layer, Calibration, and Model Matrix | Done | 2026-03-29 | epic-07 |
| 08 | Regression, Baseline, Scoring, CLI, and CI Gate | Done | 2026-03-29 | epic-08 |
| 09 | Optimizer and Experiment Engine | Done | 2026-03-29 | epic-09 |
| 10 | Team Product, Eval Packs, and Drift Operations | Done | 2026-03-29 | epic-10 |
Epic 01 → Epic 02 → Epic 03 → Epic 04 → Epic 05 → Epic 06 → Epic 07 → Epic 08 → Epic 09 → Epic 10
All 10 epics shipped between 2026-03-29 16:18 UTC (epic 01 first commit) and 2026-03-29 19:46 UTC (epic 10 first commit). Per-epic merge PRs: #4 → #13.
j-rig check <skill-dir> # Package integrity (Epic 03)
j-rig validate <file> # Eval-spec / contract validation (Epic 02)
j-rig eval <skill-dir> # 7-layer behavioral eval (Epics 05-08)
j-rig report # Query results from evidence DB (Epic 04)
j-rig optimize # Failure clustering + improvement suggestions (Epic 09)
j-rig drift # Reevaluation gating (Epic 10)
Bin name: j-rig (with hyphen). Install: cd packages/cli && pnpm build && ln -sf $PWD/dist/index.js ~/.local/bin/j-rig.
Every Bead under an epic should include:
Reference doc: 000-docs/epics/epic-NN-<name>.md
This task is governed by the epic reference doc above.
Full product blueprint: 007-PP-PLAN-master-build-blueprint.md