Skip to content

Merge pull request #2 from internxt/fix/actions #7

Merge pull request #2 from internxt/fix/actions

Merge pull request #2 from internxt/fix/actions #7

Triggered via push January 16, 2025 11:52
Status Failure
Total duration 49s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (20)
Process completed with exit code 104.
test (20)
Process completed with exit code 1.
test (22)
The job was canceled because "_20" failed.
test (22)
Process completed with exit code 104.
test (22)
Process completed with exit code 1.
test (21)
The job was canceled because "_20" failed.
test (21)
The operation was canceled.
test (16)
The job was canceled because "_20" failed.
test (16)
The operation was canceled.
test (18)
The job was canceled because "_20" failed.
test (18)
The operation was canceled.