You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
This will be used for the first iteration of ScenarioMIP IAM runs taken from historical emissions harmonisation. We will mostly follow the process from Smith et al. (2024).
CO2 Fossil & Energy from Global Carbon Project (to include or not to include cement carbonation sink?)
CO2 AFOLU from Global Carbon Project
Energy, industrial and agricultural sources for the following will be from:
CH4: CEDS (different to Smith et al. 2024) from 1970-2022, with an extension back from 1970 based on PRIMAP-Hist Third Party
N2O: PRIMAP-Hist Third Party
Kyoto F-gases: PRIMAP-Hist Third Party, with scale factor to reproduce present-day abundances with IPCC AR6 lifetimes. Per-species split to be done using RCMIP SSP2-4.5 scenario with GWP100 weighted totals. OR update from AGAGE folks
Montreal gases: based on inverting concentrations reported in Forster et al. (2024) with IPCC AR6 lifetimes. OR update from AGAGE folks
Short-lived climate forcers: CEDS
Biomass burning (applies to CH4, N2O, short-lived forcers):
CMIP6 BB4CMIP dataset 1750-1996
GFED4.1s from 1997
If time and data permits, the sources of methane will be split into biogenic and non-biogenic components.
The text was updated successfully, but these errors were encountered:
This will be used for the first iteration of ScenarioMIP IAM runs taken from historical emissions harmonisation. We will mostly follow the process from Smith et al. (2024).
Energy, industrial and agricultural sources for the following will be from:
Biomass burning (applies to CH4, N2O, short-lived forcers):
If time and data permits, the sources of methane will be split into biogenic and non-biogenic components.
The text was updated successfully, but these errors were encountered: