2025-09-09
- Internal project set up
- Repository public fork
- Building & Testing
- Specification review
- Public forks have been set up
- Pietra, Arthur and Pierre-Emmanuel have built & tested the project
- The specification has inconsistencies, an email has been sent to Nathan
-
WP1: Add
xttroccarchitecture extension (Pierre-Emmanuel) -
WP2: Add disassembler support for the ISA extension
- Misc instructions (Pierre-Emmanuel)
- Context switch instructions (Pierre-Emmanuel)
- Address Generator instructions (Pietra)
-
WP3: Test the assembler and disassembler (Arthur)
-
Provide a specification document (Nathan)
- WP1 - Extend the tool chain drivers
- WP2 - Add assembler/disassembler support for the ISA extension
- WP3 - Test the assembler and disassembler
- WP4 - Add builtin function support for the ISA extension
Builtins completed: 0/70
There are no updates to the risk table.
- Arthur will be at Oxidize from September 16 to 18
- Pierre-Emmanuel will be at Kangrejos from September 17 to 18
- Pierre-Emmanuel will be on vacation from September 19 to 25
- Pietra, Jeremy and Pierre-Emmanuel will be at GNU Tools Cauldron from September 26 to 28.
| Work package | This period | Cumulative |
|---|---|---|
| WP1 Extend the tool chain drivers | ||
| WP2 Add assembler/disassembler support | ||
| WP3 Test the assembler and disassembler | ||
| WP4 Add builtin function support | ||
| Total |