Skip to content

[meta] v0.3.x → v0.4: distribution-first 6-item plan #112

@WaylandYang

Description

@WaylandYang

Tracking the post-v0.3.1 6-item plan documented in docs/ROADMAP.md. Sequence:

4/6 done in 2 days (target was 3 months). Remaining items are open-ended (recipes can pick 3-5 from a candidate list; phase 2+3 is real systems engineering).

Rationale

Phase 1 source-pause work shipped at 143× ceiling / 6-15× typical / 14× multi-BRANCH aggregate (RESULTS-v0.3.md). Pushing the number further past 200 ms control-plane floor is diminishing returns until real user workloads point at the next bottleneck.

Items 1-3 maximize distribution (MCP for any agent client, GitHub Action for CI flow, TS SDK for JS-side agent code). Item 4 closed the Daytona stickiness gap. Items 5-6 (recipes, technical depth) come once 1-4 produce user signal.

Track classifications

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions