Skip to content

Latest commit

 

History

History
58 lines (39 loc) · 2.27 KB

TESTING.md

File metadata and controls

58 lines (39 loc) · 2.27 KB

Testing & QA Orchestration

How to run QA on any ZIL adventure using the unified tester agent.

Prerequisites

  • Adventure has a playable build (compiled ZIL, runnable via llm.lua)
  • Adventure folder exists under books/ or infocom/ with dungeon.zil and actions.zil
  • make test-pure-zil passes on existing tests (if any)
  • For a new adventure: Stages 1–8 of the game-writer workflow are complete and the adventure is packaged

Unified QA

The @tester agent runs all four passes sequentially in a single session and produces one unified report:

# Pass Skill Report Section
1 Technical Release Gate skill testing Technical Audit
2 Blind Functional Playtest skill playtesting Functional Playtest
3 Artistic Review skill artistic-review Artistic Review
4 Accessibility Testing skill accessibility-testing Accessibility

Invocation

@tester Run full QA for <adventure-name>.

Expected output: <game-name>-qa-report.md with sections for technical, functional, artistic, accessibility, cross-cutting findings, and remediation plan.

The agent maintains pass independence internally — the technical phase runs first (white-box), then functional runs blind (no technical findings carried forward), then artistic (first-experience frozen before design inspection), then accessibility (persona sessions from fresh saves).

Remediation

After the report is generated:

  1. Load skill bug-fixing for code defects
  2. Fix Critical → High → Medium → Low priority bugs
  3. Run make test-pure-zil after each fix
  4. Run affected specialist scenarios after remediation

Release Decision

The QA gate is not complete until:

  • Critical/high technical and functional defects are fixed and GREEN
  • Golden path passes from a fresh save
  • Every artistic REVISE finding has a documented revision or explicit design decision
  • Every material accessibility barrier has a mitigation, accepted limitation, or revised audience claim
  • Affected specialist scenarios have been rerun after remediation

Quick Reference: Re-test blackwood-horror

@tester Run full QA for blackwood-horror.

This generates blackwood-horror-qa-report.md. Review the report, then remediate with skill bug-fixing.