Infrastructure Cost Analysis #17
cost-analysis-example.yml
on: schedule
Quick Cost Check
0s
Cost Gate
0s
Free Tier Check
51s
Optimization Report
39s
Cost History
0s
Export Report
45s
Matrix: Multi-Cloud Summary
Annotations
8 errors
|
Multi-Cloud Summary (azure)
Process completed with exit code 1.
|
|
Optimization Report
Process completed with exit code 1.
|
|
Multi-Cloud Summary (gcp)
The strategy configuration was canceled because "multi-cloud.azure" failed
|
|
Multi-Cloud Summary (gcp)
The operation was canceled.
|
|
Multi-Cloud Summary (aws)
The strategy configuration was canceled because "multi-cloud.azure" failed
|
|
Multi-Cloud Summary (aws)
The operation was canceled.
|
|
Export Report
Process completed with exit code 1.
|
|
Free Tier Check
Process completed with exit code 1.
|