Skip to content

gh-7: Add CI/CD workflow for pre-commit and tests #2

gh-7: Add CI/CD workflow for pre-commit and tests

gh-7: Add CI/CD workflow for pre-commit and tests #2

Re-run triggered February 6, 2026 23:41
Status Failure
Total duration 39s
Artifacts

ci.yml

on: pull_request
Pre-commit checks
23s
Pre-commit checks
Matrix: Tests
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Tests (3.11)
Process completed with exit code 5.
Pre-commit checks
Process completed with exit code 1.
Tests (3.12)
The strategy configuration was canceled because "test._3_11" failed
Tests (3.12)
The operation was canceled.
Tests (3.8)
The strategy configuration was canceled because "test._3_11" failed
Tests (3.8)
The operation was canceled.
Tests (3.9)
The strategy configuration was canceled because "test._3_11" failed
Tests (3.9)
The operation was canceled.
Tests (3.10)
The strategy configuration was canceled because "test._3_11" failed
Tests (3.10)
The operation was canceled.