Skip to content

docs: reorganize guide navigation and sidebar grouping #10

docs: reorganize guide navigation and sidebar grouping

docs: reorganize guide navigation and sidebar grouping #10

Triggered via push February 27, 2026 21:33
Status Cancelled
Total duration 3m 20s
Artifacts

ci.yml

on: push
Lint  /  Changelog Guard
Lint / Changelog Guard
Lint  /  Lint
3m 17s
Lint / Lint
Docs
2m 53s
Docs
Consumer Integration (AshPostgres)
3m 8s
Consumer Integration (AshPostgres)
Matrix: Test / test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
Test / Elixir 1.17
Process completed with exit code 1.
Test / Elixir 1.17
Process completed with exit code 1.
Test / Elixir 1.18
Process completed with exit code 1.
Test / Elixir 1.18
Process completed with exit code 1.
Consumer Integration (AshPostgres)
Canceling since a higher priority waiting request for CI-refs/heads/main exists
Consumer Integration (AshPostgres)
The operation was canceled.
Lint / Lint
Canceling since a higher priority waiting request for CI-refs/heads/main exists
Lint / Lint
The operation was canceled.
CI
Canceling since a higher priority waiting request for CI-refs/heads/main exists
CI
Canceling since a higher priority waiting request for CI-refs/heads/main exists