Skip to content

Latest commit

 

History

History
67 lines (47 loc) · 2.85 KB

v3-220-aave-v3-Ethereum-orbit-program-renewal-q4-2024.md

File metadata and controls

67 lines (47 loc) · 2.85 KB

Proposal 220. Orbit Program Renewal - Q4 2024

Voting Link

Link to voting page

Governance Forum Discussions

Link to forum discussions

Payloads

Certora Analysis

Proposal Types

  • 💰 🧾 Asset transfers

  • 🏦 payment stream

Context

Proposing the renewal of the Orbit program for recognized delegates, compensating them with GHO, associated with their governance activity during Q4 2024 ( From 2024-08-31 to 2024-12-14).

Proposal Creation

Transaction: 0x24525b9d552e1e6e76096b1f1f9368f864c2726c26d497434768ec0732b4c589

  • proposalId: 220
  • creator: 0x57ab7ee15cE5ECacB1aB84EE42D5A9d0d8112922
  • accessLevel: 1
  • ipfsHash: 0xa65981356b7309a6b13687ecc05aa4a3d973771c3c61e6ebf908759f2403bd23

createProposal() Parameters

{
    "payloads": [
        {
            "chain": "1",
            "accessLevel": 1,
            "payloadsController": "0xdAbad81aF85554E9ae636395611C58F7eC1aAEc5",
            "payloadId": 223
        }
    ],
    "votingPortal": "0x9b24C168d6A76b5459B1d47071a54962a4df36c3",
    "ipfsHash": "0xa65981356b7309a6b13687ecc05aa4a3d973771c3c61e6ebf908759f2403bd23"
}

Aave Seatbelt Report

Proposal Report Link to Seatbelt proposal report

Payload Reports

Technical Analysis

The technical review confirms that all aspects of the proposal have been implemented as intended. The amounts transferred align accurately with the proposed budget, and the GHO stream has been successfully created on the Prime Instance. The stream duration is configured correctly to match the specified 80-day period, ensuring steady compensation throughout the quarter. Additionally, the addresses of the recognized service providers have been verified and match those listed in the proposal. Overall, the execution adheres to the proposal’s specifications without discrepancies.

The proposal is consistent with the description on both Snapshot and the governance forum.

Certora validations

  • ✅ The code on the proposal payload corresponds to the proposal specification.
  • ✅ The proposal includes a proper tests suite, checking all necessary post-conditions.
  • ✅ BGD reviewed the payload before the proposal was submitted.
  • ✅ Certora reviewed the procedure followed to submit the proposal.