https://vote.onaave.com/proposal/?proposalId=215
https://governance.aave.com/t/arfc-add-rseth-to-aave-v3-ethereum/17696/18
- Ethereum Lido - proposal payloads
💎 🆕 asset-listing
🤝 permission granting or revoking
This proposal aims to onboard rsETH to the Aave v3 Lido instance, enabling it as a collateral asset to deepen liquidity and enhance capital efficiency for users. It includes precise risk parameters, e-mode integration with wstETH, and measures like a seed deposit to prevent first-deposit attacks. The initiative aligns with Aave’s broader strategy for supporting liquid staking derivatives (LSDs) while maintaining a conservative risk approach.
Transaction: https://etherscan.io/tx/0xc4ffc255c6054066e95b541ce89df020be6181e864eb86f1705f24238c820441
- proposalId: 215
- creator: 0x57ab7ee15ce5ecacb1ab84ee42d5a9d0d8112922
- accessLevel: 1
- ipfsHash: 0x08f666bb422c172fd4c300bc170fb9edafb9a94eee1c9d69358492fa53769d6b
createProposal() parameters
{
"payloads": [
{
"chain": "1",
"accessLevel": "1",
"payloadsController": "0xdAbad81aF85554E9ae636395611C58F7eC1aAEc5",
"payloadId": "219"
},
],
"votingPortal": "0x9b24C168d6A76b5459B1d47071a54962a4df36c3",
"ipfsHash": "0x08f666bb422c172fd4c300bc170fb9edafb9a94eee1c9d69358492fa53769d6b"
}
Proposal report
https://github.com/bgd-labs/seatbelt-gov-v3/blob/main/reports/proposals/215.md
Payload reports
We compared the parameters in the proposal, verifying alignment between the IPFS and the payload. The first deposit protection was confirmed through the seed deposit mechanism. The price feed for rsETH was validated as correctly set. The e-mode configuration, including LTV, liquidation thresholds, and bonus, was accurately implemented. Lastly, the emission admin was properly assigned to both rsETH and its corresponding aToken.
The proposal is consistent with the description on both Snapshot and the governance forum.
✅ The code on the proposal payload corresponds to the proposal specification.
✅ The proposal includes a proper tests suite, checking all necessary post-conditions.
✅ BGD reviewed the payload before the proposal was submitted.
✅ Certora reviewed the procedure followed to submit the proposal.