Notifications
You must be signed in to change notification settings - Fork 0
/
Copy pathPart Two (Hydro Generators added).gms
100 lines (74 loc) · 3.55 KB
/
Part Two (Hydro Generators added).gms
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Set
t 'periods' / 12pm-6am, 6am-9am, 9am-3pm, 3pm-6pm, 6pm-12pm /
g 'generators' / type-1, type-2, type-3 /
h 'Hydro Generators' / type-A, type-B /
k 'parameters' / min-pow, max-pow, cost-min, cost-inc, start, number/
v 'hydro parameters' / rate, cost_ph, depletion, st_cost /
;
Parameter
dem(t) 'demand (1000mw)' / 12pm-6am 15, 6am-9am 30, 9am-3pm 25, 3pm-6pm 40, 6pm-12pm 27 /
dur(t) 'duration (hours)' / 12pm-6am 6, 6am-9am 3, 9am-3pm 6, 3pm-6pm 3, 6pm-12pm 6 /
;
Table data(g,k) 'generation data'
min-pow max-pow cost-min cost-inc start number
type-1 .85 2.0 1000 2.0 2000 12
type-2 1.25 1.75 2600 1.3 1000 10
type-3 1.5 4.0 3000 3.0 500 5
;
Table hydro_data (h,v)
rate cost_ph depletion st_cost
type-A 0.9 90 0.31 1500
type-B 1.4 150 0.47 1200
;
Variable
O(g,t) 'generator output'
Gen(g,t) 'number of generators in use'
S(g,t) 'number of generators started up'
Z 'total operating cost'
N (h,t) 'new hydro generator'
Hyd (h,t) 'working generator'
P (t) 'Pump'
ht (t) 'water level'
;
Integer Variable Gen,S;
Positive Variable O,ht,P;
Binary Variable N,Hyd;
Equation
dem_pow(t) 'demand for power (1000mw)'
reserve(t) 'spinning reserve requirements (1000mw)'
start_up(g,t) 'start-up definition'
min_out(g,t) 'minimum generation level (1000mw)'
max_out(g,t) 'maximum generation level (1000mw)'
cost 'cost definition (l)'
ht1 (t) 'initial height (m)'
ht_low (t) 'minimum of height (m)'
ht_up (t) 'maximum of height (m)'
heit (t) 'relation between differenet heights in different time periods'
h_start_up (h,t) 'start-up definition'
;
dem_pow(t).. sum(g, O(g,t))+sum(h,(hydro_data(h, "rate"))*Hyd(h,t))-P(t) =g= dem(t);
reserve(t).. sum(g, data(g,"max-pow")*Gen(g,t))+sum(h,hydro_data(h,'rate')) =g= 1.15*dem(t);
start_up(g,t).. S(g,t) =g= Gen(g,t) - Gen(g,t--1);
min_out(g,t).. O(g,t) =g= data(g,"min-pow")*Gen(g,t);
max_out(g,t).. O(g,t) =l= data(g,"max-pow")*Gen(g,t);
ht1(t).. ht('12pm-6am') =e= 16;
ht_low (t) .. ht(t) =g= 15;
ht_up (t) .. ht(t) =l= 20;
heit (t) .. ht(t++1)-ht(t)-((P(t)*dur(t))/3)+sum (h,hydro_data(h,'depletion')*dur(t)*Hyd(h,t))=e=0;
h_start_up(h,t) .. N(h,t)=g=Hyd(h,t)-Hyd(h,t--1);
cost .. Z =e= sum((g,t), dur(t)*data(g,"cost-min")*Gen(g,t) + data(g,"start")*S(g,t)
+ 1000*dur(t)*data(g,"cost-inc")*(O(g,t)-data(g,"min-pow")*Gen(g,t)))
+sum((h,t), hydro_data(h, 'st_cost')*N(h,t) + hydro_data(h, 'cost_ph')*dur(t)*Hyd(h,t));
Gen.up(g,t) = data(g,"number");
* now to sum it up:
Model HydroPower_Geneneration / all /;
HydroPower_Geneneration.optCr = 0;
* Now we do the Sensitivity Analysis: (the result of this step is available in the "Solution Report" provided by GAMS)
$onecho > cplex.opt
objrng all
rhsrng all
$offecho
HydroPower_Geneneration.optfile = 1;
* and at last to solve the model we have:
solve HydroPower_Geneneration minimizing Z using mip;
display O.l,Gen.l,S.l,Z.l,N.l,Hyd.l,P.l,ht.l;