I'm thinking make overrides applied by level 4 ecoregion rather than 3, and use the reach attribute for this instead of lumping watersheds into a single ecoregion like we have with level 3. We now have the ecoregions on the network so we should be using it to do overrides at reach scale rather than whole watershed.
I'm thinking make overrides applied by level 4 ecoregion rather than 3, and use the reach attribute for this instead of lumping watersheds into a single ecoregion like we have with level 3. We now have the ecoregions on the network so we should be using it to do overrides at reach scale rather than whole watershed.