feature staging-workflow
start-date 2018-03-05
author Vladimír Čunát (@vcunat)
co-authors Frederik Rietdijk (@FRidh)
related-issues

Summary

Define a new workflow for the staging branch that can better accommodate the current and future influx of changes in order to deliver mass-rebuilds faster to master. As part of this new workflow an additional branch, staging-next, shall be introduced.

Motivation

The current workflow cannot handle the high amount of mass-rebuilds that are continuously delivered, resulting in long delays for these deliveries to reach master. When a certain delivery causes failures, attempts are typically made to fix these failures and stabilize staging so that the specific delivery can still reach master.

Often it happens that during this period of stabilization other mass-rebuilds are submitted, and it is not uncommon that these also introduce failures, thus again increasing the time it takes for a delivery to reach master. This is especially worrisome in case of security fixes that need to be delivered as soon as possible.

Detailed design

There shall be the following branches:

  • master is the main branch where all small deliveries go;
  • staging is branched from master and mass-rebuilds and other large deliveries go to this branch;
  • staging-next is branched from staging and only fixes to stabilize and security fixes shall be delivered to this branch. This branch shall be merged into master when deemed of sufficiently high quality.

Binary packages shall be build by Hydra for each of these branches. The following table gives an overview of the branches, the check interval in hours, amount of shares, and the jobset that they build.

Branch Interval Shares Jobset
master 4 High release.nix
staging-next 12 Medium release.nix
staging 6 Medium release-small.nix

The check interval of staging-next is reduced from 24 hours (the current value for staging) to 12 hours. This can be done because only stabilization fixes shall be submitted and thus fewer rebuilds shall typically have to be performed.

The staging branch shall have a short interval of only 6 hours. This is because of the relatively small jobset, and to obtain a higher resolution to detect any troublesome deliveries.

Drawbacks

A potential drawback of this new workflow is that the additional branch may be considered complicated and/or more difficult to work with. However, for most contributors the workflow will remain the same, that is, choose master or staging depending on the number of rebuilds.

Alternatives

Maintain the status quo

The current situation could be kept, however, that would not solve any of the issues mentioned in the "Motivation" section.

Single branch

Instead of multiple branches only a single branch, say master, could be kept for development. While this removes the issue of merge conflicts, it will result in continuous mass-rebuilds on master, slowing down the delivery of binary substitutes and thus development.

Reduce Hydra jobset size

Reducing the size of the Hydra jobset would mean the iteration pace could be higher, but has the downside of testing fewer packages, and having fewer binary substitutes available.

The part about fewer binary substitutes could be partially mitigated by adding another slower larger jobset that wouldn't block the channel.

Unresolved questions

  • The exact amount of shares, which is something that has the be found out.

Future work

  • Document the new workflow;
  • Create the new branch;
  • Create a Hydra jobset for the new branch and adjust the existing jobs.