Skip to content

Refactor/adapt to 1.0.0 #809

Refactor/adapt to 1.0.0

Refactor/adapt to 1.0.0 #809

Triggered via pull request January 1, 2025 10:27
Status Failure
Total duration 9m 26s
Artifacts

build.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (nodejs)
Process completed with exit code 1.
build (python)
The job was canceled because "nodejs" failed.
build (python)
The operation was canceled.
build (quickjs)
The job was canceled because "nodejs" failed.
build (quickjs)
The operation was canceled.
build (lua)
The job was canceled because "nodejs" failed.
build (lua)
The operation was canceled.