Skip to content

feat: slashing commitments #508

feat: slashing commitments

feat: slashing commitments #508

Triggered via pull request October 20, 2025 16:22
Status Failure
Total duration 1m 40s
Artifacts
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

13 errors
test (testnet)
Process completed with exit code 1.
test (preprod)
The strategy configuration was canceled because "test.testnet" failed
test (preprod)
Process completed with exit code 1.
test (testnet-base-sepolia)
The strategy configuration was canceled because "test.testnet" failed
test (testnet-base-sepolia)
Process completed with exit code 1.
test (testnet-sepolia)
The strategy configuration was canceled because "test.testnet" failed
test (testnet-sepolia)
The operation was canceled.
test (testnet-hoodi)
The strategy configuration was canceled because "test.testnet" failed
test (testnet-hoodi)
The operation was canceled.
test (base)
The strategy configuration was canceled because "test.testnet" failed
test (base)
The operation was canceled.
test (mainnet)
The strategy configuration was canceled because "test.testnet" failed
test (mainnet)
The operation was canceled.